About Us

Services

Projects

Client List

Contact









Projects


Soil Bioengineering

Slide and slough repair with cut willow. Six months later the structure on the left has metre long roots and shoots. Both structures will transform into willow thickets strengthening the soil and drawing water from the slope or slough.

Click to view a video on YouTube of the Stoltz pool restoration on the Cowichan River, BC.

     
 
Before
Seven days later
 
 
January 2007
June 2008
 

May 2007

October 2007

August 2008


Specialty planting

Ongoing grass and wildflower planting for the Garry Oak Ecosystem Recovery Team at the Somenos Garry Oak Reserve and for Parks Canada at Fort Rodd Hill National Historic Site.

   


Garry Oak Meadow grasses and wildflowers
 

Erosion Control / Revegetation

Planting, hydroseeding, and soil bioengineering to stabilize slopes.

November 2007
November 2007
May 2008
July 2008


Silviculture

Private, forestry, and mining applications.

   


Mining land reclamation

Planting of fir and alder trees at the Quinsam Coal Mine.

   
 

 

Beach Restoration - Soil bioengineering to prevent erosion

January 2008
July 2008
 
Planting of native seaside plants and anchoring of rip rap

Riverbank and Streambank Protection
- Soil bioengineering to stabilize eroding riverbanks

Cowichan River, BC, March 2008
Cowichan River, BC, March 2008
Elbow River, Calgary, AB, July 2008
Elbow River, Calgary, AB, July 2008

 

This site is © Copyright Adams Environmental Solutions 2007, All Rights Reserved.